Operating Procedure for the Ultrasonic Seawater Desalination Membrane Welding Machine:
1. First make sure the factory power supply, three-phase five-wire (3P/380V ) is switched on;
2. Switch all equipment power switches to ON and wait 5 seconds (for all systems to reach running state);
3. After all systems are running, make sure the emergency-stop switch is released and the side safety doors on both sides are closed , then switch on the ‘power switch’. Once the touchscreen lights up, set the selector switch to the ‘manual’ position, and switch on the servo power, the fixtures, and the 4 sets of press rollers.
4. Set the manual/auto selector switch to the ‘auto’ position;
5. Set the parameters (upper heating time, lower heating time, curing time) and wait until the heating temperature reaches the set temperature (and the heat-transfer time elapses);
6. Remove all previously welded workpieces from the machine and place the new qualified workpieces to be welded (first the bottom-mold piece, then the upper-mold workpiece), placing all workpieces properly;
7. Once everything is ready, press the two green start buttons on the console panel simultaneously and the equipment starts running automatically;
8. After welding is complete, remove the finished workpieces, load new qualified workpieces, and continue with the next weld.